HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What are the differences in the notation of flat-weld flanges and butt-weld flanges in pipeline construction drawings?

2011-06-23View Original

Thread Content

What are the differences in the notation of flat-weld flanges and butt-weld flanges in pipeline construction drawings?
Reply #22011-06-23
The pipe layout diagram does not specify any requirements regarding the type of flanges
Reply #32011-06-23
It’s difficult to represent this on the drawings; it’s fine to use codes or text in the material list included in the drawings
Reply #42011-06-24
It cannot be shown on the drawings, but the flange type must be specified in the process pipeline specification sheet.
Reply #52011-06-24
On the drawings, unless a line is drawn on the valve or tank equipment connections to indicate a flange, there is no other way to indicate it, so it’s not possible to tell what kind of flange it is. Requirements are indicated only on the comprehensive material sheet or pipe specification sheet, either in Chinese characters or with PL denoting a flat welding flange and WN denoting a butt welding flange.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.