HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

For a proposed project, if one visits existing factories that are already in operation, what aspects should be given priority in the inspection?

2011-06-28View Original

Thread Content

For a proposed project, if one visits existing factories that are already in operation, what aspects should be given priority in the inspection?
Reply #22011-06-28
I will briefly discuss a few aspects: 1. Whether the device design is successful (product quality, processing capacity, energy consumption); 2. Whether the device can meet the most basic operating cycle requirements while fulfilling the design requirements mentioned earlier ; 3. Can the key equipment of the facility operate safely and stably over long periods in all seasons? ; 4. Can the three doses used meet the requirements for safety, production efficiency, cost-effectiveness, and long-term operation?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.