Is it necessary to start from the initial technical design all the way to product testing? There are many things I don’t understand
I’m not sure if you work in a design firm; if so, project management starts with the preliminary phase of the project. During this early stage, the client may request the design firm to prepare a plan outlining the total investment required for the project. Depending on the investment amount and the details of the plan, bidding might be necessary. In that case, you will need to use the plan you’ve prepared, with the support of the business department, to submit a bid. If you win the bid, then you’ll be responsible for carrying out the project. The first step is to conduct a feasibility study. During this phase, designers need to go to the site to conduct field research, primarily to communicate with the client. Project management at this stage involves keeping track of the design progress and working closely with the client. If more in-depth design work is required, it’s also necessary to ensure the feasibility of the project, that is, to maintain high standards of design quality, both in technical and non-technical aspects. If this stage is done thoroughly, subsequent stages will be simpler. It depends on the client’s requirements; some clients prefer that preliminary design work be completed even during the feasibility study phase. After this stage, the next phase is preliminary design, during which the plan needs to be further refined. There must be a detailed schedule, and clear responsibilities assigned to each specialty involved in the project, as well as proper coordination among these specialties. After this stage, the next phase is the production of construction drawings. The work procedures are similar to those in the preliminary design phase, but the work is more detailed and in-depth. For each stage of a project – feasibility study, preliminary design, and the requirements for detailed construction drawings – there are specific regulatory guidelines. You can look them up; they’re also available on Haichuan. What I’ve said might be too general. As a project manager, it’s important first to understand the level of detail and scope required for the project at each stage, what kind of professional support is needed, to what extent each specialty must contribute, and where coordination between different specialties is necessary. You don’t have to carry out these tasks personally, but you need to be able to identify and resolve any issues that arise promptly, so as to ensure that the project is completed successfully in terms of quality, quantity, and timeline.
Where it’s done, there it’s counted. There is no unified rule for the project specifying from when it counts
The question isn’t detailed enough, making it difficult to answer
It should be written in more detail so that everyone can answer!