HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Nitric acid absorption tower filling time

2011-07-04View Original

Thread Content

Dear experts: Could you please share the liquid filling time for your nitric acid plant absorption towers, the processes used, as well as specific details regarding the pressure in those absorption towers and the flow rate of the deionized water?
Reply #22011-08-30
Our plant uses a dual-pressure system with a capacity of 15W tons; the flushing time is only 1.5 hours. Flushing is completed when the pressure difference in the absorption tower remains constant, at around 0.045 MPa. Desalinated water flow: 24 cubic meters per hour
Reply #32011-09-23
Around 2 hours; it’s fine as long as the pressure is above 50 KPa
Reply #42011-09-23
Around 2 hours; it’s fine as long as the pressure is above 50 KPa

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.