HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Handling of high-pressure ash water pump tripping issues

2011-07-05View Original

Thread Content

During the handling of a high-pressure ash water pump trip, does the gasification furnace need to have its load reduced?
Reply #22011-07-05
If it can be handled in two or three minutes, then it’s not necessary; High variability can hold up for a while too
Reply #32011-07-06
Turn off the drainage; after adding the condensate, adjust it according to the liquid level in the quench chamber. It’s safer to reduce the load a bit in advance!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.