Question: What is the minimum distance between the column lines in the compressor plant and those of the pipe gallery?

2011-07-06View Original

Thread Content

Question: What is the minimum center-to-center or edge-to-edge distance between the column lines in the compressor plant and those in the pipe gallery? It would be best if a standard name or standard number could be provided. I’m currently on a business trip and need to prepare a technical proposal for the client, focusing on equipment layout. Since it’s an old factory undergoing renovation and there is limited space, I hope the spacing between the equipment can be as small as possible. I’m on a business trip and it’s not convenient to look up information. Thank you first!
Reply #22011-07-06
It shouldn’t be that big, right? . . I’m not someone who does this; I’m just talking casually. . . As long as the expansion angle of the pipe gallery foundation does not collide with the manufacturer’s foundation, that should be sufficient. . . Furthermore, when renovating old factories, it is particularly important to avoid collisions with underground utility networks. . . It is necessary to bypass the underground pipeline network. . .
Reply #32011-07-06
There are no regulations specifying this; the pipe gallery is meant to serve the compressors, so being closer isn’t a problem, as long as the foundation of the factory building and the foundations of the pipe gallery columns do not collide, and there is no interference with the underground facilities beneath the pipe gallery.
Reply #42011-07-07
What was said upstairs is absolutely correct. This can be discussed with the structural engineering team; I encountered the same issue last time. The structural response should be at least 500 mm.
Reply #52011-07-07
If a fight is inevitable, can the two foundations be merged into one? !
Reply #62011-07-08
Our compressor outlet pipelines are installed against the columns in the compressor room; initially we planned to weld them directly to the columns, but considering the high levels of vibration, we added an I-beam beside the columns instead. Metal hoses are installed at both the inlet and outlet of the compressor. The people from the design institute also agreed to do this, as long as the columns of the building don’t vibrate too much

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.