Thread Content
This post was last edited by cnooczhouyx on 2011-7-11 08:24. Daily workload statistics: Serial number, Work type, Workload score. 1: Transmitter inspection, calibration, leak detection; Temperature inspection, calibration (replacement): 1 (+1). 2: Temperature inspection (in the presence of toxic and hazardous substances): 2. 3: Temperature inspection (in the presence of toxic and hazardous substances, with climbing required): 3. 4: Flow meter inspection, calibration (replacement): 1 (+1). 5: Flow meter inspection (in the presence of toxic and hazardous substances): 2. 6: Flow meter inspection (in the presence of toxic and hazardous substances, with climbing required): 3. 7: Pressure and level inspection, calibration (single flange) (replacement): 1 (+1). 8: Pressure and level inspection (single flange, in the presence of toxic and hazardous substances): 2. 9: Pressure and level inspection (single flange, in the presence of toxic and hazardous substances, with climbing required): 3. 10: Pressure and level inspection, calibration (double flange) (replacement): 2 (+1). 11: Pressure and level inspection (double flange, in the presence of toxic and hazardous substances): 3. 12: Pressure and level inspection (double flange, in the presence of toxic and hazardous substances, with climbing required): 4. 13: (
Performance management is a delicate task that requires continuous improvement; we are unable to implement it on a widespread scale after operating it for a while, and in the end it falls through, with both advantages and disadvantages.
What industry is your company in, and what is the figure for the instruments?