Daily Question: [2011.7.14] How many devices in the gasification unit are considered oversized devices?

2011-07-14View Original

Thread Content

How many pieces of equipment in the gasification unit are considered oversized equipment? Diameter 3000mm, length 20000mm, weight 50000kg.
Reply #22011-07-14
Overdimensional equipment generally refers to such equipment used in railway transportation; see the attached document. In gasification units, the equipment that exceeds specified limits varies depending on the scale and gasification process; for gasifiers with a capacity of less than 1,000 tons for water-coal slurry, it is mainly the mills and vacuum flash tanks that exceed these limits. Settling tanks and slurry tanks are fabricated on-site. The situation is different for SHELL technology and Lurgi technology. The main concerns are: coal mills, gasifiers, waste boilers, vacuum flashers, high-pressure nitrogen tanks, heat drying ovens, etc. See below for the requirements: Rules for the Transport of Railway Goods That Exceed Dimensions or Weight Limits. Article 1 – General Provisions: These rules are formulated in accordance with relevant laws and regulations such as the Railway Law of the People’s Republic of China, the Regulations on the Safety Protection of Railway Transport, the Technical Management Regulations for Railways, and the Regulations on Railway Freight Transport, in order to standardize the transport of railway goods that exceed dimensions or weight limits and ensure transportation safety. Article 2 These rules apply to **railways with standard gauge, joint-venture railways, local railways and dedicated railways, as well as railway sidings; they serve as the basic basis for the transportation of oversized and overweight goods by railways. The carrier, shipper, and consignee shall all comply with these rules. Article 3: The transportation of oversized and overweight goods is of great significance for meeting the needs of **key infrastructure projects and national defense construction, as well as for promoting sound and rapid development of the national economy. Railway authorities at all levels must attach great importance to this matter, strengthen organizational leadership, and assign dedicated personnel to oversee the transportation of such goods. The railway bureau shall establish a Railway Bureau Committee for the Transportation of Overdimensional and Overweight Goods and Gauge Management, with the deputy director in charge of transportation as chairman, the chief engineer as vice chairman, and the heads of relevant departments as members. The freight stations and railway depots directly under the railway bureau should establish a leadership team for the transportation of oversized and overweight goods, with the station or depot managers as its leaders. The management committee and leading group should establish working procedures, define responsibilities, and be responsible for coordinating and resolving major issues arising in the transportation of oversized and overweight goods. Article 4: When handling the transport of oversized or overweight goods on each main railway line (section) and at each station (including dedicated railways and sidings), the carrier must obtain the necessary qualifications and permits as required by regulations. Chapter 2 Definitions and Classification Article 5: After the goods are loaded onto the vehicle, if the vehicle remains on a horizontal straight line and any part of the goods exceeds the basic outline of the limits for locomotives and vehicles, or if, when the vehicle moves along a curve with a radius of 300 meters, the calculated width of the goods exceeds the basic outline of those limits, such goods are considered oversized goods. The rolling stock gauge diagram is shown in Attachment 1. The method for calculating the width of the goods is shown in Attachment 2. Article 6: Based on the degree of excess dimensions of the goods, oversized goods are classified into three categories: Class 1 oversized, Class 2 oversized, and Super oversized. 1. Grade 1 excess: A height of 1250 millimeters or more above the rail surface, but not exceeding the limits for Grade 1 excess ; 2. Secondary excess: Those that exceed the limits for primary excess but not the limits for secondary excess, as well as those whose height above the rail surface is between 150 millimeters and less than 1250 millimeters, exceeding the limits but not reaching the level of secondary excess ; 3. Super-excessive: Those exceeding the limits for level 2 excess. The overlimit limits charts for various levels are shown in Attachment 3. The table showing the dimensions in the vertical plane perpendicular to the line centerline for the rolling stock clearance, various types of over-limit clearances, and building clearances is provided in Appendix 4. Article 7: Based on the height of the part of the cargo that exceeds the limits, oversized cargo is divided into three types: upper oversized, middle oversized, and lower oversized. 1. Upper excess: The height from the rail surface exceeds 3600 millimeters, in case of excess at any part ; 2. Central excess height: The height measured from the rail surface ranges from 1250 millimeters to 3600 millimeters; any excess in this range is considered a violation ; 3. Lower excess: Any part where the height from the rail surface is between 150 millimeters and less than 1250 millimeters. Article 8: Goods whose total weight, including the live load, after loading exceeds the design live load (medium-live load) specified for bridges and culverts are referred to as overweight goods. Article 9: Depending on the degree of excess weight, overweight goods are classified into three categories: Grade 1 overweight, Grade 2 overweight, and Super overweight. 1. Grade 1 overweight: 1.00<Q≤1.05 ; 2. Secondary overweight: 1.05<Q≤1.09 ; 3. Super-heavy: Q>1.09.  Note: Q is the live load factor. The overweight cargo classification table is shown in Attachment 5. Chapter 3: Shipment, Acceptance, and Carriage Article 10: When the shipper sends goods that are oversized or overweight, in addition to following the regular shipping procedures, the following information must also be provided: 1. A description of the oversized or overweight goods (Form 1), along with three views of the goods’ shape. The diagram should indicate the relevant dimensions of the goods, as well as the length of the load-bearing surface, and the center of gravity should be marked with a “+” sign. 2. For self-propelled freight cars, information on their own weight, number of axles, axle spacing, fixed axle distance, length, distance between the bogie center pins, type of braking system, and operational restrictions shall be provided. 3. The types, models, and number of vehicles to be used, along with the planned reinforcement plan. 4. Other specified materials. The shipper shall stamp or sign the declaration for shipping oversized and overweight goods, the planned loading and securing plan, as well as the provided documents, and bear full responsibility for the accuracy of their contents. Article 11: When accepting goods that exceed size or weight limits at the station, the station shall carefully examine the technical documents provided by the shipper, measure the dimensions of the goods and the location of their center of gravity, and if necessary, organize relevant departments to conduct joint discussions. After review, a telegram requesting permission for the transport of oversized and overweight goods was sent to the railway authority to inquire about the shipping procedures. For overweight and extra-large oversized goods at all levels that involve four or more railway bureaus, the relevant railway bureaus shall conduct a review and then submit a request to the Ministry of Railways. Article 12: The measurement of oversized goods is in millimeters. Measurements before and after loading shall be carried out in accordance with the following regulations. 1. Before loading, measure according to the planned loading and reinforcement plan: (1) Length: measure its maximum length, the length of the load-bearing surface, the distance from the center of gravity to the end, and the distance from the inspection section to the center of gravity. (2) Height: Starting from the load-bearing surface, measure its center height, side height, and center of gravity height. ①Center height: The height from the load-bearing surface to the maximum height is the center height ; ②Side height: The height from each measurement point below the center height to the load-bearing surface. If there are several different side heights, each distinct side height should be measured from top to bottom. (3) Width: Measure the width at the center height and the width at different side heights. ①Width at the center height: at the center height, the maximum width on the left and right sides of the vertical longitudinal plane where the cargo’s center of gravity lies ; ②Width at side height: At each side height, the maximum width on the left and right sides of the longitudinal vertical plane where the cargo’s center of gravity is located. 2. After loading, measure based on the actual loading and reinforcement condition (including reinforcement materials): (1) Length: ① When loaded across, measure the span distance and the length outside the two support points ; ②When protruding during loading, measure the length of the vehicle’s end beam that protrudes ; If the protrusions at both ends are not equal, they should be measured separately. (2) Height: The center height and side height are measured from the rail surface. (3) Width: Starting from the vertical plane containing the vehicle’s longitudinal centerline, measure the center height as well as the width on the left and right sides at different side heights. Article 13: Upon receiving a telegraph requesting the transportation of oversized and overweight goods, the Ministry of Railways and the railway bureaus shall issue instructions to the relevant units regarding the methods of shipment. The telegraphic codes for the transport of oversized and overweight goods are listed in Attachment 6. Article 14: Upon receiving directives or telegrams copied to it, the Railway Bureau shall promptly forward them in light of the actual conditions within its jurisdiction. For cases where temporary changes to buildings or fixed equipment are required, these should be specified in detail in the telegram. If there are indeed difficulties in passing through the pipeline, the issuing office and the party that issued the telegram should be notified by phone and telegram within three working days from the date of receipt of the telegram. Article 15: Upon receiving the telegram with instructions from the railway bureau, the station shall promptly organize loading in accordance with the loading and securing plan. If the measurements after loading do not match the indicated telegram, further approval must be sought. Article 16: Loading of telegrams without authorization for exceeding limits or weights is prohibited; a loading quality approval system shall be implemented. Article 17: After loading, the play between the side bearings on either side of the vehicle’s bogie must not be zero (except for freight cars whose design specifies constant-contact side bearings). In the case of a freight car with a spherical center disc where the play between the side bearings on one side is zero, a jack can be used to lift that side; once the side is raised, the appearance of play indicates that the cargo is loaded properly. When using drop holes or clamp-type vehicle loading methods, the distance between the bottom of the loaded goods and the rail surface must be at least 150 mm. Article 18: After loading, clearly marked inspection lines that make it easy to determine whether the cargo has moved should be drawn using brightly colored paint. On both sides of the cargo, the words “Grade X overdimensional, Grade X overweight” should be written, painted, or stuck on, or signs should be installed. Article 19: After loading the goods, the dispatching station shall fill out the record for the transport of oversized and overweight goods (Format 2), and indicate “oversized goods”, “overweight goods”, or “oversized and overweight goods” on the goods waybill, ticket, envelope for documents, and marshalling sequence sheet” ; When transported in a coupled train configuration, it should be specified that \"the coupled train set must not be separated\"” ; When operating at a limited speed, it should be indicated as “Limited speed: XX km/h”. And place the truck identification plate on the vehicle as required. Article 20: Before dispatching vehicles that exceed weight or size limits from the departure station, a telegraph requesting permission for the dispatch of such vehicles must be sent to the railway bureau’s dispatch office (a telephone request may also be made if the conditions do not permit it). Article 21: When goods that exceed size or weight limits are to be diverted to a different station, the station that handles the request shall measure the dimensions of the goods after they have been loaded, and then send a telegram to the railway authority for further approval, indicating the original approving authority, the telegram number, the new destination station, and the vehicle number. The station that accepts the change shall inspect the loading and securing condition of the goods and sign off on it in the \"Record of Transport for Overdimensional and Overweight Goods\". Article 22: For large equipment that exceeds size or weight limits, the shipper shall consider the feasibility of transporting it by rail during the design phase; if necessary, it should be manufactured in sections. For goods that pose difficulties in transportation, measures such as changing the packaging and disassembling the cargo should be taken to minimize any excess dimensions or weight. Article 23: Goods that, after loading, extend beyond the basic dimensions of the locomotive and rolling stock limits may, with the approval of the Ministry of Railways, be handled without being treated as oversized goods. Article 24: To ensure the safety of transporting extremely large and oversized goods, methods such as inspection frames may be used to check and confirm whether the limits of the transportation route or section can be satisfied. 1. The dimensions of the inspection frame should be identical to the actual dimensions of the cargo’s inspection cross-section. 2. The vehicle equipped with the inspection frame should be of the same model as the vehicle to be used. 3. The inspection frame should be installed at the location of the cargo inspection section. When using another vehicle to install the inspection frame, it should be installed at the cross-sectional position corresponding to the center pin of the vehicle’s bogie. The dimensions of the inspection frame must take into account the deviations and tilts of the vehicle to be used. Article 25: The railway bureau shall, by the 5th of each month, compile statistics on the number of shipments of oversized and overweight goods within its jurisdiction from the previous month in accordance with Format 6 and Format 7, and submit them to the Transport Bureau of the Ministry of Railways. Chapter 4: Inspections During Transport, Article 26: Inspections of vehicles carrying goods that exceed size or weight limits are important measures to ensure the safe transportation of such goods. Railway authorities must strengthen inspections of such vehicles during their journey and implement a system of responsibility for specific sections. Article 27: Checkpoints along the route shall inspect vehicles carrying goods that exceed weight or size limits in accordance with the following items, and record the inspection results: 1. Whether there is a record of the transport of such overweight or oversized goods, and whether that record is complete ; 2. Are there clear markings indicating any over-limit or over-weight conditions on both sides of the cargo? ; 3. Are inspection lines marked? Has the cargo moved? Are the securing materials loose or damaged? ; 4. The play between the left and right side bearings of the vehicle’s bogie must not be zero (except in cases where the structure specifies constant-contact side bearings and spherical center discs). Chapter 5: Operation of Vehicles with Excessive Dimensions or Weight Article 28: Upon receiving a request from a station regarding the transportation of such vehicles, or a forecast from an adjacent railway bureau, the dispatch office of the railway authority shall verify the details of the request or forecast against the relevant instructions regarding the transportation of goods with excessive dimensions or weight. It shall then establish specific operating conditions, fill out the notice form for transporting vehicles with excessive dimensions or weight (Format 3), and include this information in the daily (shift) plan. Before dispatching vehicles that are oversized or overweight and that span two dispatch centers, approval from the dispatch center of the adjacent station must be obtained. The forecast information between adjacent dispatching offices should include the train numbers involved, the numbers of the relevant telegrams, the type and model of the vehicles, the destination stations, the name of the goods, the level of overdimension, the level of overweight, as well as any relevant precautions. Before dispatching trains carrying oversized or overweight cargo, the dispatch office shall issue dispatch orders to the relevant stations and depots, specifying the specific operating conditions. Article 29: Upon receiving the coupling order, the station shall promptly make preparations for coupling the vehicles and hand over the dispatching order to the on-duty driver. Article 30: Vehicles that exceed size or weight limits shall be transported via the shortest route; however, when affected by building constraints or other unfavorable factors, an alternative route may be designated for transportation. Overweight and oversized vehicles with operational restrictions shall, unless otherwise specified, be prohibited from being included in direct or through trains. Article 31: Trains carrying oversized vehicles shall be dispatched, received, or passed along the routes specified in the Detailed Rules for Station Operations (hereinafter referred to as the \"Station Rules\"). In case of special circumstances requiring a temporary change in the route, approval from the railway authority is necessary. Article 32 When a train carrying an overdimensional vehicle meets a train on an adjacent track, the following rules shall be observed: 1. When the train passes through a station, the minimum distance between it and the vehicles on the adjacent track must be no less than 350 millimeters ; 2. When trains are operating on straight sections of double-track, multi-track, or parallel single-track routes, the minimum distance between two trains in motion shall be such that no speed limit applies if it is greater than 350 millimeters ; For those ranging from 300 millimeters to 350 millimeters, the operating speed per hour (hereinafter referred to as speed) shall not exceed 30 kilometers per hour ; Meeting is prohibited for those less than 300 millimeters. Curved sections must be widened accordingly as specified. 3. On trains carrying oversized vehicles with a half-width in the middle and upper sections exceeding 1800 millimeters, EMUs, direct express passenger trains, express passenger trains, and express mail special trains are prohibited from operating on that section. 4. Trains carrying oversized vehicles are prohibited from running in EMUs on CTCS-2 level sections. Article 33: When oversized vehicles are in operation, and any part of the oversized cargo comes close to buildings or equipment, the following rules must be followed: 1. If the distance between any oversized part of the cargo and the boundary limits of the building (hereinafter referred to as the boundary distance) is between 100 millimeters and 150 millimeters, the speed must not exceed 15 kilometers per hour ; 2. When the limit distance is between 150 millimeters and 200 millimeters, the speed must not exceed 25 kilometers per hour ; When the limited distance is less than 100 millimeters, the railway authority shall specify the operating procedures based on the actual circumstances. Article 34: Vehicles carrying oversized goods of Class 2 or higher are prohibited from being released unattended. Article 35: Each station shall include the procedures for handling trains that are oversized or overweight, the fixed routes for such trains, as well as the relevant limits, in the detailed station regulations. Chapter 6 Transportation on Electrified Sections Article 36 Conditions for transporting oversized goods on electrified sections with or without power interruption: 1. On electrified sections, transportation can be carried out without power interruption when the vertical distance L between the top of the oversized goods and the contact wire is ≥350 millimeters; when 100 ≤ L < 350 millimeters, transportation is possible without power interruption after covering it with insulating covers; when 50 ≤ L < 100 millimeters, transportation must be carried out with power interrupted. 2. The vertical distance between the top of the oversized cargo and the contact wire shall, when the elevation of the track surface is above 1000 meters, be calculated by adding an additional safety distance of 3.5 millimeters for every 100 meters exceeded (rounded off if the distance is less than 100 meters). Article 37: The insulating soft covers used in electrified sections must be products that have undergone scientific and technical evaluation by the Ministry of Railways, and have been certified by testing institutions recognized by technical supervision departments at or above the provincial or ministerial level. It must pass a voltage resistance test before use, and the instructions provided in the user manual must be strictly followed during use. Article 38: The railway authority shall designate stations where insulating covers are to be applied and removed. Personnel responsible for applying and removing these insulating covers, as well as those tasked with overseeing them, must have completed training approved by the railway authority. Article 39: The covering, removal, and troubleshooting of insulated flexible covers must be carried out in areas without electricity. Chapter 7 Special Train Transportation Article 40: For super-large equipment that is urgently needed for key projects and national defense construction, as well as heavy vehicles that require personnel to supervise and monitor their operation, special trains for transporting oversized and overweight goods can be operated. When transportation spans three sections, approval is required from the Ministry of Railways ; In the case of transportation across two sections, it is determined through consultation among the relevant railway authorities ; For transportation within the jurisdiction of the bureau, it is determined by the railway bureau itself. Article 41: Before a special train is put into operation, the approving authority shall hold a transportation coordination meeting to organize relevant units and departments to formulate a transportation plan and safety measures. Article 42: The Railway Bureau shall establish a special train transportation leadership team responsible for organizing the implementation of special train transportation plans within its jurisdiction. Chapter 8: Management of Building Limits Article 43: Railway bureaus must, in accordance with the Provisions on Railway Technical Management, regularly inspect the building limits within their jurisdiction, and submit the relevant data on the building limits for routes used for transporting oversized goods to the Ministry of Railways for record-keeping. Article 44: The construction limit data shall include a table of the comprehensive minimum limit dimensions for each section, cross-sectional drawings, as well as relevant technical data for the line (minimum track spacing, minimum curve radius, minimum switch type, etc.). Article 45: When it is necessary to temporarily reduce the existing gauge on the lines used for transporting oversized goods during construction, the construction party shall submit a written request to the railway authority. After reviewing the request, the railway authority shall forward it to the Ministry of Railways; construction may only proceed upon approval. Article 46: Without the approval of the Ministry of Railways, no entity or individual shall reduce the original limits without authorization. If equipment and buildings encroach upon the limits set for railway structures in violation of regulations, the responsible entities shall be held accountable and required to remove them within a specified time frame. Chapter 9: Handling of Overdimensional Goods in International Transport Article 47: For imported (including transshipment) overdimensional goods transported by rail, the Department of International Cooperation of the Ministry of Railways (hereinafter referred to as the International Department) shall, in accordance with the relevant regulations on international transport, and after receiving correspondence from the railways of the relevant countries regarding such overdimensional goods, review and determine the details in conjunction with the Transportation Bureau (with the participation of the relevant railway bureaus if necessary). For those that can be transported, in addition to responding by telegraph to the relevant national railway, the relevant domestic border railway authorities should also be notified. Upon receiving the preliminary (confirmed) notification from the railway border station of the neighboring country, the border station must carry out all necessary preparations prior to taking over the shipment. Upon the arrival of oversized goods at the border station, the shipping method shall be consulted with higher authorities in accordance with Articles 10 and 11 of these rules, and the reloading shall be organized promptly based on the approved shipping method. Article 48: For oversized goods exported (including through transit) by rail, the loading station shall seek approval from the railway authority in accordance with Articles 10 and 11 of these rules. After review by the Railway Bureau, it seeks guidance from the Transportation Bureau and the International Department. Upon receiving the request, the International Department consults with the Transport Bureau (inviting the relevant railway authorities if necessary), and in accordance with the relevant regulations on international freight transport, reaches an agreement with the railways of the relevant countries. The results of this agreement are then communicated to the Transport Bureau, which in turn forwards them to the relevant railway authorities. Chapter 10: Operation and Management of Long-Gauge Freight Cars Article 49: The standby, release, use, and return of long-gauge freight cars shall be handled in accordance with the dispatch orders issued by the Ministry of Railways, and the dispatch offices of various railway bureaus must inform each other in advance. Upon receiving the dispatch orders from the Ministry of Railways or the forecasts from neighboring railway bureaus, the railway bureau shall promptly incorporate them into the daily (shift) plan and dispatch the trains to the designated stations. Trains should be dispatched quickly at each stop along the way to avoid delays. When returning long-gauge freight cars to the station, a \"Return Form for Special Freight Cars and Transport Equipment\" should be filled out, indicating the destination station and the dispatch order number. Article 50: The Railway Bureau shall submit the plan for the use of large-gauge freight cars for the following month to the Transport Bureau of the Ministry of Railways by the 25th of each month. At 18:00 every day, the entry and exit of heavy freight cars within the jurisdiction, their current locations, and their load status are promptly recorded according to vehicle type, serial number, location, departure station, and arrival station, and reported to the Transportation Bureau of the Ministry of Railways. Article 51: Long-gauge freight cars shall be operated in strict accordance with the vehicle technical specifications. The table of common technical parameters for large cargo vehicles is provided in Appendix 1. Article 52: The registration book for long and heavy goods vehicles at 18:00, as well as the registration book for vehicles exceeding size and weight limits (during loading, unloading, and operation), are shown in Format 4 and Format 5. Chapter 11 Supplementary Provisions Article 53 These rules shall be interpreted by the Transport Bureau of the Ministry of Railways. Article 54: In the event that other regulations regarding the transportation of oversized and overweight goods on railways conflict with these rules, these rules shall prevail. Article 55: The Railway Bureau may, in accordance with these rules, formulate supplementary regulations for its jurisdiction and submit them to the Ministry of Railways for the record. These rules shall come into effect on April 1, 2007. The former Ministry of Railways’ \"Rules for the Transport of Overdimensional Goods by Rail\" (No. 〔79〕 Tieyun Zi 1900) is hereby repealed simultaneously.
Reply #32011-07-15
Washing towers, gasification furnaces, deoxygenation tanks, and coal grinders are not considered excessive-size equipment. This is also related to the road conditions in the area, right?
Reply #42011-07-16
There are few devices of this size in our facility. 1. Coal dust storage tank: vertical, φ4800×16853mm; Total volume: 202.3 m3. 2. Gasification furnace: vertical type, ID 2756×14474 mm; total volume: 75 m3. Total weight: 145,000 KG. 3. Syngas washing tower: vertical type, ID 2600×9770 (T-T) mm; total volume: 58 m3. Total weight: 59,500 KG. That’s all; other large components such as coal bins and sedimentation tanks are constructed on-site.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.