What are the specific requirements for obtaining a trial production license?

2011-07-18View Original

Thread Content

What are the specific requirements for applying for a trial production poetry certificate? Is a single-unit test run possible?
Reply #22011-07-18
A licensing system is not currently in place for trial production; instead, a system for filing plans is employed. For details, refer to the \"Measures for the Safety Licensing of Hazardous Chemicals Construction Projects\" (Order No. 8 issued by the State Administration for Work Safety) and Document No. (18) \"Opinions of the State Administration for Work Safety on Safety Licensing for Hazardous Chemicals Construction Projects and the Filing of Trial Production (Use) Plans\" (An Jian Zong Wei Hua No. 121).
Reply #32011-07-18
Yes, registration for trial production is sufficient. A safety production license is mandatory!
Reply #42011-07-18
For details, see the \"Opinions of the State Administration for Work Safety on the Safety Licensing for Hazardous Chemicals Construction Projects and the Filing of Pilot Production (Use) Plans\" (An Jian Zong Wei Hua No. 121). Generally required: 1. Application form for the filing of the trial production (use) plan for the (name of the construction project). 2. Approval form for the trial production (use) plan of the (name of the construction project). 3. Classification confirmation letter for safety permit management of the construction project. 4. Opinion letter on the safety review for the establishment of the construction project. 5. Opinion letter on the safety permit for the design of safety facilities in the construction project. 6. Qualification certificates of the design, construction, and supervision units. 7. Procedures for quality supervision of the construction project
Reply #52011-07-18
It is best to consult the local safety supervision agency, especially the department responsible for approving the project (the same one that handles design reviews), as practices vary from place to place. The \"Implementation Measures for Safety Permits of Hazardous Chemicals Construction Projects\" stipulate that the project owner shall organize relevant units and experts to identify potential safety issues and corresponding countermeasures that may arise during the trial production (use) of the project, and shall formulate a comprehensive plan for trial production (use) in accordance with relevant laws, regulations, rules, and standards regarding work safety. The trial production (operation) plan for the construction project shall include the following elements related to safe production: (1) The completion status of the construction work for the project ;    (II) Types of hazardous chemicals produced and stored, as well as design capacity ;    (III) Potential safety issues during trial production (use) and countermeasures ;    (IV) Safety measures taken ;    (5) Emergency rescue plan for accidents ;    (VI) Start and end dates of trial production (use). So the process is quite complex. In our area, for pilot production of hazardous chemicals projects, it is necessary to hold meetings and conduct on-site inspections before approval for pilot production can be given. In principle, testing can only begin after approval is obtained, including individual unit tests. Generally, during actual operations, some single-unit tests and joint tests without materials can be carried out on one’s own before approval is obtained (not recommended). In addition, it is necessary to hire a qualified agency in a timely manner to prepare an inspection report before the end of the trial production period; the inspection must be completed before that deadline, or an extension for the trial production must be applied for promptly. Generally, trial production should not exceed 2 years in duration.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.