I’m a newcomer who’s been assigned to a design training program; I don’t know where to start

2011-07-21View Original

Thread Content

I. Tank Farm Design: A material tank farm is designed to store the following materials; Serial Number Material Name Tank Capacity (cubic meters) Number of Tanks 1 Methanol 50 2 2 Styrene 50 2 3 Hydrochloric Acid 20 2 Task Requirements: 1. Design the piping and instrumentation diagram ; 2. Design the equipment layout diagram ; 3. Selection of shaping equipment and preparation of procurement condition sheet ; 4. Selection of custom equipment and preparation of a diagram outlining the requirements for its fabrication ; 5. Identify the civil infrastructure conditions and electrical conditions ; 6. Design pipeline layout diagram 7. Pipe outlet section table and comprehensive material table ; 8. Outlet pipe characteristic table ; 9. Layout diagram of the outlet ; 10. List of Equipment to be Delivered ; This is a topic related to the design of one of the tank areas. I have never designed anything like this before, and I’m not sure what to do first or what to do next. I hope everyone can give me some advice. Thank you so much!
Reply #22011-07-21
Senior, please give some guidance and point me in the right direction. Thank you!
Reply #32011-07-21
Come in and take a look. I can’t help you with that; it’s a double-glazed reactor
Reply #42011-07-21
You’re addressing both the process and piping together; do the process first, then the piping, go ahead
Reply #52011-07-21
Reply to 4# zero229: Yes, in our company, all things related to process piping are handled by the process department – process comes first. Could you be more specific? Does it mean performing calculations for various pipes, pumps, and valves? I’m just a bit confused; I don’t know in which books I should look up this information, nor do I know what I should do. Thank you! ~~
Reply #62011-07-21
I work in piping; we don’t handle PID – that’s the responsibility of the process engineers. If you already have the PID, then I can talk about the rest. However, I suggest you ask the experienced teachers at your workplace.
Reply #72011-07-21
Reply to 6# zero229: Oh, haha, okay. Thank you!
Reply #82011-07-21
Reply 1# MC Jianjian, come in and learn* a bit
Reply #92011-07-21
Reply to 8# Xiaoxiaomuzi: I’m also learning *! ! ! ! ! !

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.