Gansu Hongsheng Coal-to-Gas Project

2011-07-29View Original

Thread Content

This post was last edited by kkxxzyb on 2011-8-15 at 11:59. Regarding the 4 billion cubic meters per year coal-to-natural gas production project carried out by Gansu Hongsheng New Energy Co., Ltd., does anyone know which design institute was responsible for its design? 1. Project name: Gansu Hongsheng New Energy Co., Ltd.’s 4 billion cubic meters per year coal-to-natural gas project. 2. Nature of construction: New construction. 3. Location of construction: Tuerbataan Circular Economy Industrial Demonstration Park, Zhangye Industrial Park, Gansu Province. 4. Scope of construction: Includes a coal-to-natural gas plant with a capacity of 40×108 m3/year, a thermal power plant, as well as related utility systems, environmental protection measures, storage and transportation facilities, and other supporting infrastructure.
Reply #22011-07-30
It seems to be Saiding Engineering Co., Ltd
Reply #32011-07-31
Has the bidding for this project already started?
Reply #42011-08-02
What kind of furnace is being used? Could you reveal a little?
Reply #52011-08-02
“It seems to be Saiding Engineering Co., Ltd. – they don’t seem very reliable; I’ve never heard of this project before! Hehe
Reply #62011-08-07
It is still under approval process; the feasibility study was completed not long ago, and now the environmental impact assessment is being carried out.
Reply #72011-08-09
Are you looking to hire people for coal-to-natural gas projects? You can post the job on Coal Talent (job recruitment website)
Reply #82011-08-09
China’s natural gas consumption is too high, and supply will be a problem in the future. However, coal-to-natural gas does pose issues related to energy and water consumption as well as carbon emissions, which require caution.
Reply #92011-08-09
Reply to 7# Shi Tuyan: Which design institute designed that? Brother Stone!
Reply #102011-08-11
From January 18 to 19, the city’s ** authorities invited experts from China’s coal chemical industry, as well as leaders from departments such as the Provincial Development and Reform Commission and the Department of Water Resources, to hold a meeting in Lanzhou to review the feasibility study report for the 4 billion cubic meters per year coal-to-natural gas project in Zhangye. After carefully listening to the detailed presentation by the design firm, Saiding Engineering Company (formerly the Second Chemical Industry Design Institute), the experts and representatives present conducted a thorough review from various aspects including industrial policies, laws and regulations, process technology routes, plant scale and equipment capacity, auxiliary facilities, raw material and power supply, economic benefit assessment, occupational safety and industrial hygiene, environmental protection and fire safety, as well as energy conservation and emission reduction. They then put forward detailed suggestions for revisions. The experts and representatives present agreed that the project has good prospects and benefits, and should be implemented as soon as possible.   The owner of the 4 billion cubic meters per year coal-to-natural gas project in Zhangye is Gansu Hongsheng New Energy Co., Ltd., a subsidiary of Jiugang Group. The project is located in the Tuerba Tan Circular Economy Industrial Demonstration Park within the Zhangye Industrial Park, and its main product is coal-to-natural gas, with an annual production capacity of 4 billion cubic meters. The total investment in the project is 20.6 billion yuan; it will consume 14.2 million tons of coal and 20 million cubic meters of water per year. Construction is scheduled to begin in 2011, with completion and operation set for 2014.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.