HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Where should blind plates be installed for air separation purging?

2011-08-01View Original

Thread Content

This post was last edited by you*n*nyou on 2011-8-1 at 19:47. When purging air separation units, where are blind plates generally installed? Could some friend summarize this?
Reply #22011-08-01
Air purging is used to remove slag, rust, and other debris from inside. It is necessary to concentrate the air supply and purge in segments in order to achieve a more thorough cleaning and make it easier to remove the debris; purging points should be placed wherever such segments are located. There is no air flow inside the cold box, and blind plates also need to be installed on the flanges of the cold box walls

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.