Regarding the feed to the bottom of the ASPEN column, is it sufficient to feed it below the lowest tray?

2011-08-14View Original

Thread Content

When we talk about feeding at the bottom of a steam column, does specifying a location in ASPEN refer to right below the lowest tray? Does the bottom of the stripping tower require no reboiler?
Reply #22011-08-15
I’m also puzzled by this question; I hope experts can answer it!
Reply #32011-08-15
That's how it is. A reboiler is sometimes needed at the bottom of the tower.
Reply #42011-08-18
For example, if the total number of trays is 50 (including the condenser) and there are 50 trays at the bottom of the tower, then the stripping steam enters 51 trays above that stage. If a stripping tower uses stripping steam, then no reboiler is needed; sometimes, however, a stripping tower does not use stripping steam but instead relies on a reboiler, such as in a normal stripping column

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.