HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Problems with storage tank fire dikes and water cut oil collection devices!

2011-08-17View Original

Thread Content

““There is a fire and oil barrier drainage device installed outside the fire dike, which consists of a water seal well and an oil cut-off device together.” Is there any relevant information available? Please advise me.
Reply #22011-08-17
Poster: Download the \"Code for Design of Water Supply and Drainage Pipelines in Petrochemical Industries SH3034-1999\" from the forum for reference! Here is the forum link: http://bbs.hcbbs.com/viewthread.php?tid=658544

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.