We are now facing the commissioning of a new set of catalytic units, and we hope fellow sailors can offer some suggestions. From the commissioning of the equipment and the formulation of plans, to the inspection of construction quality and personnel, etc.? Thanks first! !
Reply #22011-08-22
Getting a new set of equipment up and running isn’t something that can be explained in just a few words. First, there must be enough personnel to carry out the work, and these workers must have proficient skills. The necessary auxiliary workshops must also be available, and supplies such as wind, water, electricity, and gas must be ensured. It is essential to follow the operating procedures strictly.
Reply #32011-08-22
Our company’s facility is not expected to start operations until next year; the startup plan alone is dozens of pages long~
Reply #42011-08-22
Senior upstairs, the content you want needs to be put in a compressed file; you can’t ask for it one by one. Let’s talk about the personnel first. Don’t you have any staff yet? You should recruit everyone a year in advance so that they can start working on the catalytic units. If your factory has such units, recruit some team leaders and chief operators. By the way, have you ever worked with catalytic systems before? Certain standards are used for acceptance checks. From a technical perspective, it involves verifying whether the construction was carried out correctly according to the drawings, checking whether the gaskets were installed properly, and ensuring that the bolts are tightened adequately. Defects are detected through flaw detection, hydrostatic testing, and airtightness checks, and these inspections must be carried out thoroughly during the construction process. Before starting work, conduct pipeline targeting with the construction unit to remove impurities. Water intermodal transport and oil intermodal transport are also required. The general plan for starting up is as follows: 1. Comprehensive inspection: Check whether the process is correct, and ensure that vents are closed ; Are the fuel and raw material nozzles unobstructed? ; The blind plate is in the correct position ; Test control valve ; Flue steam injection, water injection, auxiliary burner nozzles, and so on. 2. Purging, pressure testing, and airtightness testing: to be carried out at the design pressure. 3. Ignite, bake the lining, fractionate and introduce oil, stabilize the cycle: follow the temperature rise curve. 4. Remove the large oil and gas blind flange, expel air, and feed oil for distillation. 5. Load the catalyst and fluidize both reactors. 6. Inject fuel during the reaction, and start the air compressor. 7. Adjustment operation. Generally, design institutes will provide the relevant materials for the project commencement plan.
Reply #52011-09-14
Catalytic cracking operator, once you find this book, you’ll have the basic concepts and operating principles.
Reply #62022-05-27
First, arrange the organizational structure of the workshop by establishing a leadership team for the commissioning of the equipment, identifying the relevant workshop leaders, arranging for personnel recruitment and preliminary training, and preparing a training plan for the staff.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.