HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How to ground a control system? Preferably in detail!

2011-08-21View Original

Thread Content

How should the control system be grounded? A detailed explanation would be great! I hope experts can give some guidance!
Reply #22011-08-22
For detailed grounding requirements, please refer to the following standard: HGT 20513-2000; Instrumentation System Grounding Design Specifications.pdf; SHT 3521-2007 Technical Specifications for the Construction of Petrochemical Instrumentation Projects.pdf
Reply #32011-08-23
Reply to 2# Xue Er Piao Piao: Could you send me your email address? acbcxhy@126.com. Thank you!
Reply #42011-08-23
Reply to 1# Xiao Huyang: The control system grounding includes protective grounding, working grounding, and system grounding. Both protection grounding and working grounding are covered by relevant specifications. System grounding is determined based on the specific conditions of each manufacturer; generally, during the setup of the DCS, it is the DCS manufacturer who decides whether system grounding is necessary, and if so, the electrical engineering team handles the installation of the grounding busbars and similar components.
Reply #52011-08-23
Search online and you’ll find many options; each type has specific requirements regarding the diameter of the grounding wires. In general, single-point grounding is required, and the grounding resistance should be measured before the system is powered on – DCS systems require a resistance of less than 4 ohms, while PLC systems require it to be less than 1 ohm.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.