Seeking guidance on the design process for liquid sulfur storage tanks

2011-08-22View Original

Thread Content

I’m just starting to work with this, so thanks to everyone for any advice you can offer; A 500M3 liquid sulfur storage tank is to be installed at the factory, but how should the top of this tank be sealed? Are there any other aspects to consider in tank design? Thank you! ! ! The process is as follows: Liquid sulfur, after being sealed with sulfur, goes to the ——> liquid sulfur tank ——> pump ——> liquid sulfur storage tank
Reply #22011-08-23
There is usually an air vent on the top of the tank. I’m not sure what you mean by sealed Is the purpose of setting up the sulfur tanks to load liquid sulfur? In such cases, the tank foundation is usually designed to be relatively high to provide sufficient space for loading liquid sulfur.
Reply #32011-08-23
Leave a sufficiently large vent pipe on the top of the tank; it is preferable to use a jacketed vent pipe

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.