Request for trial production report
Thread Content
Our company is a private refinery that has been in operation for only 2 months; we are currently applying for a safety license. I urgently need to write a trial production report; I’ve never done this before so I don’t have many ideas. Could that teacher help me come up with some ideas or give me a template? Thank you in advance!Table of Contents
I. Project Overview 4
(1) Project Description: 4
(2) Production Facilities, Process Flow, and Construction Status 6
(1) Production Facilities 6
(2) Brief Description of the Process Flow 7
(3) Construction Status 9
(3) Utility Systems and Auxiliary Facilities 18
(1) Water Supply and Drainage 18
(2) Power Supply and Lighting 19
(3) Heating and Ventilation 20
(4) Heat Supply 20
(5) Telecommunications 20
(6) Lighting 21
(7) Maintenance and Laboratory Analysis 21
(8) Fire Protection 21
(9) Lightning and Static Electricity Protection 22
(10) Seismic Resistance Design 22
(11) Labor Allocation 23
(12) Wastewater Treatment 23
(13) Environmental Characteristics, Measures, Instrument Selection, and Control Measures 23
(4) Raw Materials, Fuel, Power Supply, and Product Flow 28
II. Basis and Principles for Formulating the Commissioning Plan: 29
III. Guiding Principles and Standards for Commissioning: 30
IV. Conditions Required for Commissioning 31
(1) Completion of individual unit tests and intermediate project handovers 31
(2) Completion of integrated system tests 31
(3) Completion of personnel training 32
(4) Establishment and implementation of various production management systems 32
(5) The approved chemical feeding commissioning plan has been reviewed by relevant personnel 33
(6) Arrangements for ensuring operational continuity have been made 33
(7) The water supply and drainage system is operating properly 33
(8) The power supply system is functioning stably 33
(9) The steam supply system is operating smoothly 34
(10) All chemical raw materials are available 34
(11) Sufficient spare parts are available 34
(12) The communication system is reliable 34
(13) The material storage system is in good condition and ready for use 34
(14) The logistics transportation system is ready for immediate use 35
(15) Safety, fire protection, and emergency response systems are in place 35
(16) The production scheduling system is operating normally 36
(17) Environmental protection measures comply with the “three simultaneities” principle 36
(18) Preparations for laboratory analysis are complete 37
(19) On-site security measures have been implemented 37
(20) Living and logistical support services are in place 37
(21) The commissioning team and expert group members have arrived on site 38
V. Organization and Command Structure for Commissioning 38
(1) Organizational structure and command for commissioning 38
(2) Technical advisory group 38
(3) Commissioning and operational continuity support system 39
VI. Commissioning Plan and Schedule 39
(1) Brief introduction to individual unit tests, integrated system tests, and chemical feeding commissioning plans 39
(2) Commissioning schedule, arrangement principles, and time for chemical feeding and production of qualified products 59
(3) Commissioning procedures, key control features, evaluation of chemical plants, and schedule for trial production 70
1. Commissioning procedures 70
2. Key control features and evaluation of chemical plants 73
3. Schedule for trial production 74
(4) Overall commissioning schedule diagram 76
VII. Material Balance 76
(1) Load during chemical feeding commissioning 76
(2) Comparison between planned consumption indicators for major raw materials and design values (or contract guaranteed values) 76
(3) Material balance sheet 77
1. Summary table of main product outputs 77
2. Table of major raw material consumption indicators 77
3. Economic and technical indicators 78
4. Input-output chart of major materials 79
VIII. Fuel and Power Balance 80
(1) Balance of fuel, water, electricity, and steam 80
(2) Appendices 81
1. Fuel balance sheet 81
2. Electricity usage plan 82
3. Steam consumption balance sheet 82
4. Nitrogen balance sheet 82
5. Water usage balance sheet 83
IX. Safety Protection and Hygiene 83
(1) Safety, fire protection, occupational health, and emergency rescue organizations, personnel, and responsibilities within the commissioning organization and command structure 83
(2) Basic preparatory work 86
X. Environmental Protection 94
(1) Environmental monitoring and treatment of “three wastes” 94
(2) Measures, methods, and standards for treating “three wastes” 96
1. Measures and methods for treatment 96
2. Applied standards 99
(3) Table of “three wastes” emissions and treatment 100
XI. Challenges and Countermeasures in Commissioning 102
XII. Commissioning Cost Calculation 104
XIII. Start and End Times for Trial Production (Operation) 105