HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regarding the preliminary design

2011-08-29View Original

Thread Content

I would like to ask everyone: what kind of conditions should the client generally provide for the preliminary design, and what is the scope of work for the design agency (in the case of soda ash)?
Reply #22011-08-29
Data on water and electricity usage, land use data, meteorological data
Reply #32011-08-29
It should still be based on the contract agreed upon by both parties; factors such as the installation capacity, the capacity to supply utility services, and the site conditions for building the plant (land availability, climate) must certainly be taken into account.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.