HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Reasons for shutting down PV-601

2011-08-31View Original

Thread Content

This post was last edited by sunjl1981 on 2013-1-6 at 22:52. The large return valve of the chlorine compressor here has stopped working; the set pressure is 1 kilopascal, but the pressure reaches up to 1.6 kilopascals. Have anyone else encountered a similar issue? Please help analyze the cause. Thanks. # + +
Reply #22011-09-01
It is necessary to automatically adjust the PID parameters of the valve…
Reply #32011-09-01
It would be better if the poster drew a simple diagram; that way it will be easier to understand
Reply #42011-09-01
I encountered a problem with a control valve a few days ago; it was one of the 3k models that come built-in, and it was also interlocked with the chlorine compressor. So that valve is quite problematic in case it breaks down

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.