How to adjust PID control after changing the liquid level measurement range

2011-09-17View Original

Thread Content

For example, in a level gauge where 100% level originally corresponded to 500 mm, but after the sampling point was changed, 100% now corresponds to 1000 mm. How should the PID control parameters of the valve connected to it be adjusted?
Reply #22011-09-18
This post was last edited by chensf123 on 2011-9-18 02:00. In this control system, the adjustment channels remain unchanged; it is the plant element that has changed, with the time constant of the controlled object increasing. If the original PID parameters are still used, the transition time will increase. If PI control is used, the proportional gain and integral time should be reduced to enhance the control effect. (Regulation mode optional: P or PI)
Reply #32011-09-20
This probably doesn’t need to be changed; just adjusting the corresponding range of control should suffice.
Reply #42011-09-23
Reply to 2# chensf123: If it is PI control, do both P and I need to be reduced?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.