Procedure for obtaining permits for pressure vessels

2011-09-23View Original

Thread Content

I would like to ask, for pressure vessels to obtain the necessary permits, what stages – from production to arrival at the factory and then to installation and commissioning – require notification to the boiler inspection agency?
Reply #22011-10-31
1. Notification procedures must be carried out before installation, usually by the installation company. 2. To register the pressure vessel, a registration form needs to be filled out, with the owner and the construction company working together on this process. 3. The construction company is responsible for obtaining the inspection certificate. 4. A registration certificate for the use of the pressure vessel must also be obtained
Reply #32011-10-31
This problem is really troublesome; it would have been so much better if it had happened in the past. It has no practical meaning.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.