HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What issues should be considered during the commissioning of the BOG unit in an LNG plant?

2011-10-13View Original

Thread Content

I’m new here and there’s so much I don’t understand; I earnestly ask for the guidance of those who are more experienced.
Reply #22011-10-13
We are mainly concerned with the gaseous phase during loading. Our company is equipped with a BOG compressor that can capture 3 kilograms of this gaseous phase and send it back to the inlet of the feed gas compressor, thereby avoiding waste through venting and saving energy.
Reply #32011-10-14
Reply to 2# dddhl77520: Our factory has been in operation for a long time, and there are always various problems; I can’t specify exactly what they are
Reply #42011-10-17
We can discuss it and learn together; you can share your questions. I worked there for three years before.
Reply #52011-10-21
Reply 1# kun605: During the commissioning of the BOG system, it is important to ensure that the temperature of the BOG does not drop too low. Additionally, attention should be paid to the inlet pressure and flow rate of the BOG compressor, as well as the oil level in the lubricating oil and the adjustment of the slide valves
Reply #62014-08-08
It's sufficient to meet the operating conditions of your compressor.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.