HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What aspects of inspection should be carried out when shutting down a circulating fluidized bed boiler?

2011-10-23View Original

Thread Content

This post was last edited by zgj2405 on 11-8-2011 at 12:43. What inspections should be carried out when shutting down a circulating fluidized bed boiler?
Reply #22011-11-15
This post was last edited by dongjiang1001 on 2011-11-15 at 17:54: furnace air nozzles, water-cooled wall tubes, primary and secondary air chambers, convection tube banks, furnace walls, flues, dust collectors, blowers and exhaust fans.
Reply #32013-11-10
I’ve learned something from this; thanks to the original poster for the insightful comments~~~
Reply #42013-11-12
Check whether the boiler tubes are severely worn and whether they need to be replaced

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.