Summary Table of Issues Related to the Three Inspections and Four Determinations in Chlor-alkali Enterprises

2011-11-01View Original

Thread Content

The last edit to this post was made by sunjl1981 on 2013-1-6 at 22:19. Dear colleagues: In addition to the items covered in the standard checklists, could we discuss and share the problems identified during the original three-inspections and four-fixes processes in your factories? If you can provide a summary table, please send it to luckerst@sina.com. For equipment and pumps, inspections are mainly carried out by the equipment staff; Process pipeline category: mainly focused on process inspections ; Model pump: The main body is intact; the fixing bolts, swing shaft pins, drain valves, etc. are all present and in good working condition. The coupling is properly connected, and the bolts meet the required standards. The inlet and outlet valves, as well as the lubrication and cooling systems, are properly installed – they are aligned neatly and there are no blockages or leaks. The cooling water system is connected correctly with no errors. The injectors are in good condition and functional; the oil storage tank is clean. The lubricating oil used meets the specified requirements. The rods, piston rings, etc., are installed properly, with wear limits and valve integrity meeting the specified standards. The materials and specifications of the internal components meet the requirements. All components are free from deformation, cracks, or damage, and their installation is proper. The vent connections to the pumps work smoothly. The specifications and installation of the impellers are correct. The shaft can rotate freely with even stress distribution. There are enough bolts, and they are properly tightened. # + +
Reply #22014-03-05
Great sharing; I really need to thank you! ! !
Reply #32014-03-05
This seems not to be entirely in line with the three checks and four confirmations, right? The concept of \"three inspections and four determinations\" seems to be primarily applied to engineering construction projects; what you mentioned is probably related to identifying potential hazards on the premises of chlor-alkali enterprises, right?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.