The lining of the two vessels is completed; what needs to be checked for these two vessels?

2011-11-18View Original

Thread Content

This post was last edited by jbcyf on 2011-11-18 08:38. The lining of the two devices is completed; what needs to be checked for those two devices?
Reply #22011-11-18
Check for overheating during lining installation; if not, inspect the refractory bricks in the auxiliary combustion chamber, the main air distribution pipes, the single-acting slide valves, as well as the quality of the linings in both devices. Also examine the internal components of these devices and check the inclined tubes to ensure that no lining has fallen off

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.