HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How many tank cars are allowed to be loaded/unloaded per day using the train loading arm?

2011-11-25View Original

Thread Content

SH/T3107-2000 states that \"the number of daily batches processed at each loading station should not exceed 4.\" My understanding of this is that each loading arm at the station can be used for loading only 4 times a day; generally, one batch can be filled in 1 hour, which means there is a lot of time left idle each day. Since I have no prior experience in storage and transportation, I am now dealing with the loading and unloading of flammable liquids on trains. I would be grateful if anyone with expertise could offer some guidance. . .
Reply #22011-11-25
The one hour you mentioned can be used to fill up a fuel tank – that’s the actual time required for loading. Beyond that, there’s also time needed for train scheduling and aligning the train, among other things. All of these take time. Have you considered these times? ?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.