Regarding the installation requirements for the waste discharge pipes of the ammonia synthesis plant, since our plant is new, we are concerned that the installation may not be perfect; we would appreciate your advice!
Reply #22011-11-26
Please explain clearly what kind of waste fluid is being referred to: fresh gas waste fluid, recycled gas waste fluid, separator tank waste fluid, ammonia cooler waste fluid, waste heat exchanger waste fluid, steam backwash waste fluid, hot or cold water system waste fluid, or oil waste fluid
Reply #32011-11-26
This post was last edited by MoonlightAndBirds at 13:13 on November 26, 2011. Reply to 2# TH373637: Could you please provide a detailed explanation for each of the aforementioned installations, one by one? Thank you! Take an ammonia synthesis plant as an example; for instance, if the waste heat exchanger’s discharge pipe is not long enough or lacks elbows, in other words, it does not meet the requirements, how should it be installed? Please share your thoughts!
Reply #42011-11-27
That’s a rather complex topic. Take a look at the regulations regarding chemical piping: waste streams with high pressure or high temperature must be fixed in place and secured properly. They are usually connected to the equipment using flanges, with two valves used for control. Elbows are necessary, and the waste streams must be directed toward drainage pipes or sewers; direct discharge into the air should be avoided, and the waste must be sent to a safe location
Reply #52011-11-27
It is possible to consider installing a buffer tank on the waste discharge pipeline, with all waste discharge pipes connected to this buffer tank; All waste discharge pipelines must be equipped with two control valves ; A self-regulating drain valve must be equipped with front and rear stop valves as well as bypass valves.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.