HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The preliminary design for the DMTO project at Qinghai Salt Lake has passed review

2011-12-14View Original

Thread Content

This post was last edited by jordan569 on 2013-1-6 at 20:43. In the third quarter of 2011, Qinghai Salt Lake Industry Group Company, in accordance with the project construction schedule, entrusted MCC Coking & Refractory Engineering Co., Ltd. and Sinopec Luoyang Petrochemical Engineering Company to prepare the preliminary designs for the integrated magnesium metal project, which includes a coking facility with an annual capacity of 2.4 million tons and a DMTO facility with an annual capacity of 1 million tons. . Note # ) # # , . hcbbs
Reply #22012-06-02
The design progress is severely delayed; no major projects have been carried out at the salt lake, and the wastewater system is inadequate
Reply #32012-06-02
Will that deep blue water still be there? Is there anything left that hasn’t been taken care of in this **!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.