Discussion on Article 5 of 6.4.2 of GB 50160-2008 Code for Fire Protection Design of Petrochemical Enterprises

2011-12-28View Original

Thread Content

This post was last edited by gubingfeng on 2011-12-28 at 22:43. Article 5 of 6.4.2 in GB 50160-2008, the Code for Fire Protection Design of Petrochemical Enterprises: When there are no buffer tanks on site, an emergency shut-off valve that is easy to operate should be installed on the loading and unloading pipelines, at a distance of 10 meters from the loading and unloading cranes. The piping diagram is attached. The distance from the flexible hose to the pump inlet is over 10 meters, so an emergency shut-off valve is required. However, if such a valve is installed, it must be placed in front of the filter; as a result, the distance between the shut-off valve and the flexible hose becomes less than 10 meters. It is stated in point 5 of section 6.4.2 that the 10-meter distance refers to a safety margin, and therefore the shut-off valve must be installed beyond this 10-meter range so that it can be safely shut off in case of an emergency, thereby avoiding any risks. So the valve in the attachment is not suitable. According to my colleague, if a shut-off valve is to be installed, it needs to be placed 10 meters away; otherwise, no such valve should be added. If not added, when the distance from the flexible hose to the pump is greater than 10 m, it definitely does not meet clause 5 of 6.4.2 ; If it is added, the pipeline needs to first be routed for 10 meters, then a shut-off valve is installed, after which it is routed back before being connected to the pump inlet. However, such a piping arrangement is not aesthetically pleasing (I have never seen such a setup), it also increases the flow resistance, so it is not suitable. I’m faced with difficulties regarding the issues mentioned above, so I’ve come here to ask experts for help in understanding the true meaning of point 5 in section 6.4.2. I also want to know whether it’s necessary to install an emergency shut-off valve; if so, what is the most appropriate way to do so. Thank you!
Reply #22011-12-28
I’m really sorry; I can’t send attachments
Reply #32011-12-29
This question is really meaningful; it can be added directly. What’s the problem if it’s less than 10m?
Reply #42011-12-29
If that’s what my colleague understood from point 5 of 6.4.2, then a distance of less than 10m does not constitute a safe distance; in the event of an emergency, the location of the emergency shut-off valve would be in a hazardous area, making it impossible to operate it
Reply #52019-10-26
I’ve encountered this problem recently as well and am trying to solve it.
Reply #62019-10-28
Follow the specifications strictly; it can be added to the pump outlet pipeline
Reply #72019-10-28
What is the purpose of installing this operable emergency shut-off valve, and is it feasible to do so?
Reply #82019-10-28
Once the flexible hose becomes disengaged, it can be shut off urgently to reduce material leakage

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.