How is the pause time set when restarting after a sudden power outage?

2012-01-10View Original

Thread Content

How do everyone’s factories set the time? Which pumps are set to allow instant shutdown and restart?
Reply #22012-01-11
Generally, there are two approaches: one is to initiate the devices in batches; that is, once low voltage is detected, all devices are shut down, and then they are started in several batches according to the process requirements. This situation is generally used in locations where the power supply or transformer capacity is small. Another method is batch tripping: within a specified time frame, if the voltage returns to normal, the equipment does not trip; only after the power outage lasts longer are the devices tripped in batches based on their importance. In this case, the power supply capacity must be large.
Reply #32012-02-17
Auto-starting upon power restoration is not allowed, except for some first-class loads.
Reply #42012-05-17
Our factory’s equipment might be quite old; every time there’s a power outage, we have to follow the factory’s emergency procedures: first restore high-voltage power, then low-voltage power, and finally start up the critical equipment. I don’t know how to manage the factory’s power distribution after setting up this automatic startup feature.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.