Seeking help with the Automated placement command in PDS

2012-01-14View Original

Thread Content

In the piping, I first used the Place command to draw a pipe segment and a 90-degree elbow. Due to the angle of connection, I then used the Skewed intersection feature in the Sketch command to connect them. Finally, I used the Automated placement command to carry out automatic piping. However, I had a question: since I didn’t delete the existing pipe segments before performing automatic piping, would the pipes generated automatically overlap with those existing segments? After I connected them with Sketch lines, the newly drawn Segment lines and the existing ones do form a complete center line. I’m seeking help from experts; thank you! ! !
Reply #22012-01-20
If there are no Type C or Type P errors, then there is no overlap
Reply #32012-01-31
It seems the original poster is referring to two pipe sections; in other words, there are extra welds, but it doesn’t pose any problem. If you want a single pipe, just delete the pipe segment and then lay the pipe again

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.