HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

All devices are inspected every few years

2012-01-14View Original

Thread Content

This post was last edited by jbcyf on 2012-1-16 at 10:06. Now the inspection interval for these devices has been changed to once every three years, but there are many problems with the materials used for the devices and pipelines; the equipment is not reliable at all, and the pipelines start leaking after a short time. There are various types of leaks, and I really don’t know how to get through three years under such conditions. I wonder what’s the situation for everyone else?
Reply #22012-01-14
It’s all a major overhaul once a year; planning for the maintenance begins in April or May each year, and it is usually completed by September in the north
Reply #32012-01-14
Many of them are held once a year; it depends on the specific circumstances. It seems that in the north, they are usually held in autumn, so that one can spend the winter peacefully after the repairs are completed
Reply #42012-01-15
CNPC and Sinopec generally conduct repairs every two or three years, while local refineries carry out repairs annually.
Reply #52012-01-15
We conduct a major repair every three years, and minor repairs each year
Reply #62012-01-15
We carry out planned maintenance once a year, usually in October. After the maintenance, we prepare to spend the winter peacefully, but it’s possible that equipment issues may force us to suspend operations
Reply #72012-01-15
We carry out minor repairs once a year; the device has been in use for over 2 years without any major repairs
Reply #82012-01-16
Our factory conducts maintenance once a year; the equipment is over a decade old.
Reply #92012-01-16
We also conduct a major repair every three years and a minor repair every year
Reply #102012-01-16
It was overhauled in 2010; no overhaul is planned for 2012, so it can be considered to have followed the three-year maintenance schedule.
Reply #112012-01-18
Reply 10# crazymoonman: It is a vacuum distillation unit

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.