A certain heat exchanger is installed using concrete embedded foot bolts; after it is lifted into place, alignment, leveling, and adjustment of its elevation are required. Shims are needed at this time; are there any requirements regarding the thickness and material of these shims? Is secondary grouting necessary? Which part is grouted during secondary grouting? Is it needed below the sliding plane?
Reply #22012-01-20
Garbage HaiChuan – not even a reply. I’m really impressed, truly impressed
Reply #32012-01-20
It should be the same material as the thigh part, I guess.
Reply #42012-01-29
If the quality of civil construction is good, shims are not required. But when shims are needed, their thickness is only a few millimeters to around 10 millimeters; otherwise, it indicates that the civil engineering work is of poor quality. Ordinary steel plates can be used for the material. Shims do not require secondary grouting. Secondary grouting is the grouting of embedded bolts. It should be below the sliding plane.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.