HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues regarding the qualification for partial analysis design

2012-02-03View Original

Thread Content

The entire equipment is designed in accordance with GB150, while individual components are designed through analytical methods; no certificate for analytical design is required for the whole unit. Does that person then need an analytical design certificate? If an individual does not need a SAD design approval certificate, can this analysis still be guaranteed?
Reply #22012-02-03
This post was last edited by Hunhun on 2012-2-3 at 10:24. No certificates are required, but the person signing must ensure correctness and accuracy; The person who signs in case of problems. . . There must be tens of thousands of people who are able to carry out simple local analyses. As for determining whether such analyses are accurate and reasonable, that’s harder to say. The absence of a certification does not mean a lack of competence in conducting audits; therefore, certification is not directly related to actual skill level
Reply #32012-02-03
In fact, the documents are merely to prove that the procedures meet the requirements. There is no absolute relationship between certificates and proficiency levels. To conduct analysis, one must have the necessary skills in this area.
Reply #42012-08-06
Are only containers that adopt the 4732 design as a whole required to have an SAD certificate? And for devices that require local analysis, such as the nozzles of some reactors, is it okay to operate them without certification?
Reply #52014-04-08
According to GB150.1-2011, designers and design units that do not require a certificate can also carry out analytical design: o
Reply #62014-04-08
It’s best for the person in charge to have the certificates that need to be analyzed
Reply #72014-06-12
Note that this refers only to the analysis and design of the local structure, not the overall structure; for the overall structure, analysis and design require certain qualifications from the design firm
Reply #82014-06-12
But when you’re not sure, it’s better to have someone with SAD audit qualifications do it – it’s like buying insurance

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.