For a 250,000-ton caustic soda project, seeking information on standard equipment.

2012-02-10View Original

Thread Content

This post was last edited by sunjl1981 on 2013-1-6 at 20:56. Our company is planning to establish a project for producing 250,000 tons of caustic soda, and we would like to obtain technical information regarding the key equipment required for this purpose. Such as hydrogen compression units, hydrogen chloride synthesis furnaces, liquid chlorine plants, evaporation units, plate heat exchangers, acid and alkali pumps, etc. It’s better to have performance records; you can send the information to: 13940585532@139.com. # + + . hcbbs
Reply #22012-02-10
Could you tell which project it is? Is there downstream PVC support?
Reply #32012-02-10
Our company is in the evaporation business. Feel free to contact us if needed to determine the information you require!
Reply #42012-02-10
Hello, Mr. Zhang. The documents have been sent; please check them. You are welcome to visit our company for an inspection and guidance. If you have any other requirements, feel free to contact us by phone.
Reply #52012-02-10
Hello, owner. I am currently looking up information on other equipment manufacturers, and once I have gathered it all, I will send it to you.
Reply #62012-02-10
Do hydrogen compressors and turbines have standby units? Currently, different companies choose different processes, resulting in significant differences in equipment parameters
Reply #72012-02-13
The hydrogen compressor unit has a standby unit, which is planned to be made domestically. For the chlorine turbine, Siemens (3K) models are planned to be used; is it necessary to have a backup unit? It is said that many factories do not have backup machines.
Reply #82012-02-13
Thank you very much. Our project is still in the initial planning stage; we are first gathering some information and conducting research to prepare for future bidding and design work.
Reply #92012-02-13
A 3k turbine does not require a backup unit, provided that the equipment used in the chlorine treatment process is handled with care; the water content in chlorine must be kept below 50 ppm. Additionally, the competence of the operators is important, as problems could lead to prolonged downtime for repairs.
Reply #102012-02-14
Are you dealing with complete sets of equipment for caustic soda evaporation plants, including the associated processes?
Reply #112012-02-14
Well, 32–99% – both the turnkey solution and the process package are available

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.