After feeding the material into the gasifier, what checks should be carried out on site?
The most important thing to check is the nitrogen valve on the pressure tapping pipeline, as well as the opening status of all other key valves. To prevent the opening and closing of the valve from affecting the commissioning time. For example, in our factory, the pressure-taking pipeline became red-hot due to the nitrogen supply to it not being activated.
Check for leaks, and ensure that the flow meter, pressure gauge, and temperature gauge are functioning properly. Also, check whether there is any vibration in the pipes and if the pump is making unusual noises.
It indicates that there is a leak at the outlet of your pipeline. . .
In addition to checking the operation of each valve, the 03 return line should be cleaned promptly to prevent coal slurry sediment from blocking the pipes.
Cleaning of the coal slurry circulation pipeline, and replacement of blind flanges. Thermal tightening of the burners, and activation of the flushing water for various flow meters and level gauges. Switching of black water.
At this point, it is sufficient to follow the procedures specified in the operating regulations, as these regulations are all taken from the process package. It is mainly used for voltage boosting and leak detection to check for any abnormalities in the system.