Does anyone who is aware of it know anything about the PVC project at Inner Mongolia Zhonggu Mining? Has the recruitment started now? Is acetylene produced by dry or wet methods? Does anyone know and want to share?
It’s almost here; the civil work has begun,,,
How are the projects at Chugoku Mining this year? Could you introduce it? I would like to go and take a look if I get the chance. I hope those who are aware of the situation can share information with me. I work in the field of fiber bed mist eliminators; thank you very much
The civil work has started, but not on a large scale yet; the design institute is working on the process design.
This post was last edited by caocheng on 2012-3-16 at 18:31. Which design institute was tasked with doing it? Does anyone know?
Is PVC acetylene produced by wet or dry methods? Does anyone know?
When is the start date planned for the Nakatani Mining project, and what is the current progress? Those who are aware of this situation are welcome to share information and provide guidance. Thank you very much
As far as I know, dry acetylene is being prepared for use.
Where is this factory?:):) :)
Do you know which design institute it is? Friends, what do you think? Is acetylene a wet-process method?
Does anyone know that for the newly built PVC project, acetylene is produced using a wet process? Tell me about it