Process simulation of chemical plant facilities

2012-03-15View Original

Thread Content

Given Aspen’s powerful functions, it is essential for plant process engineers to master this tool. I have also seen firsthand how engineers abroad use Chemcad to solve practical problems. I have the following questions: 1) The main task of plant process engineers is to address practical technical issues, while most of these problems are related to design and calculation, which are not relevant to us. How can we find examples of plant simulations and related problems? 2) How to simulate existing devices? Is there a general procedure? 3) If simulating a tower, should all stream data be entered (including components), or can there be default streams? Is it necessary to enter the heat input to the reboiler and the heat removed by the condenser? Do the equipment parameters of the tower need to be entered? Such as tower diameter, tray spacing, tray type, and size? A generous reward will surely be given! !
Reply #22012-03-15
I would like to share my own opinion. 1) Aspen is not just about design; optimization is also very important, especially for factories. Aspen Dynamics allows for dynamic simulation, and having data on factory processes is crucial for correcting models and simulating current conditions. 2) To simulate existing devices, as I understand it, one first needs to establish a PFD simulation of the process flow, then add control points to create a PID control system, and finally carry out optimized configuration. 3) For a simulation tower, the composition, temperature, pressure, and flow rate of the feed are necessary; what about the default stream? I don’t quite understand this. Other conditions depend on the type of tower you are simulating; generally, a design specification is required for each heat load. The equipment parameters of the tower can be ignored during the preliminary design stage
Reply #32012-03-15
What is your QQ number? My number is 1693900221. I work at a coal chemical enterprise in Xinjiang, which is currently in the project construction phase. Hope to communicate more

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.