HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

There are specifications, procedures, and precautions for the civil work of cable trenches. Please ask an expert for help!

2012-03-15View Original

Thread Content

Thank you~~~ It refers to cable trench works in cities, with a typical depth of 1.5 meters to 1 meter. Place 6 steel pipes inside.
Reply #22012-03-20
What role does the OP play? Party A? Supervisor? Design?
Reply #32012-03-21
It’s not clear, but there are floor plan collections that can be used as a reference!
Reply #42012-05-15
Following the design specifications for power cables, it is actually necessary in many cases to adapt the approach to local conditions, avoiding connections or intersections with other pipeline trenches; attention should also be paid to waterproofing during the construction of cable trenches.
Reply #52012-05-16
For cable trenches alone, refer to 02J331; if there are cable shafts, refer to 07SD101-8

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.