Reform plan for excessive discharge of low-pressure steam in the steam pipeline network of methanol plants?

2012-03-26View Original

Thread Content

The gas generation rate of the high-pressure drum is 160 tons/h; the auxiliary boiler generates 30 tons/h at a medium pressure of 4.4 MPA during continuous operation. The synthesis drum produces 40 tons/h of gas, while the process drum generates 20 tons/h. High-pressure steam consumption amounts to 160 tons/h, with 70 tons of steam extracted for use in turbines at medium pressure, 20 tons extracted at low pressure, and 50 tons/h extracted by each small turbine. The amount of steam used for distillation is less than 50 tons. The excess low-pressure steam is continuously vented. How can this vented low-pressure steam be utilized more effectively? Currently, options such as gas lift recovery and the addition of systems for recovering heat from this steam are being considered. Are there any other more cost-effective renovation options?
Reply #22012-03-27
It would be best if we could sell through partnerships with other manufacturers.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.