HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The packing of the valve in the high-temperature and high-pressure condensate pipeline is completely damaged, causing severe leakage; if it does not interfere with production, what should be done?

2012-04-03View Original

Thread Content

The packing of the valve in the high-temperature and high-pressure condensate pipeline is completely damaged, causing severe leakage; if it does not interfere with production, what should be done?
Reply #22012-07-22
Check for a bypass; if one is available, activate it to disconnect this pipeline; If there is no bypass, check whether it is possible to install a blind flange in front of the valve for isolation; if isolation is not feasible, careful maintenance must be carried out, with repairs to be done during shutdowns or when an opportunity arises

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.