Thread Content
I would like to ask everyone: what information does the client need to provide when preparing a special report on fire safety? (What includes the drawings and written materials?) Also, does anyone have the guidelines for the fire protection section?
The materials required by the fire department are: 1. Application form for review of fire protection design for building functions; 2. Legal identification documents such as the business license of the construction unit; 3. Planning approval documents for new or expanded construction projects; 4. Qualification certificates of the design unit; 5. Fire protection design documents. The requirements of the administrative approval office are: (Number of copies must be specified) 1. Approval document from the Development and Reform Commission; 2. Planning Bureau’s red-line map ; 3. External fire water supply network diagram ; 4. Special materials for fire protection design ; 5. Complete set of engineering drawings ; 6. Other materials: Generally, it works like this – the fire safety aspects are addressed during the initial stage of the project. During the design and construction phases, the design is prepared according to the construction drawings, and the owner submits it for approval. Fire safety considerations are then evaluated based on those drawings and relevant standards, with feedback provided; the design team makes the necessary adjustments in accordance with this feedback. The design must also provide information on the construction elements, such as the building area, fire compartments, and fire separation distances. Finally, experts are convened to hold a design review meeting; only after approval can the construction team proceed with construction according to the drawings. Because in the end, the fire protection system was inspected and approved in accordance with the opinions from the design review.