Which expert can tell me where this project was designed? If it’s inconvenient, a private message works as well. Replies earn points!
A single set with a capacity of 1 million tons represents too high a risk; it would be difficult to source that much coal tar there, at 3,000–4,000 tons per day, and it might end up being just a showpiece project.
1 million tons is true; it’s 2X500,000 tons. Single unit processing capacity: 500,000 tons
Even Shanxi doesn’t dare to undertake such large-scale projects; where does Hubei get that much tar?
So far this year, none of the new projects launched in Shanxi have exceeded 500,000. On such large-scale projects, everyone will either not have enough to eat or will go hungry, and in some cases even die of hunger! ! The project launched by Wuhan Iron and Steel is 50W per unit! ! I’m not sure if another 50W will be needed later on! !
In the country, people like to do this: before the installation even takes place, they first exaggerate the claims
This project is implemented in two phases, with 500,000 tons per phase, and it was designed by MCC Coking & Refractory (Anshan Coking & Refractory Institute).
Designed by Jiaonai Institute, it utilizes the atmospheric and vacuum distillation technology independently developed by the institute.
Do you know how far this project has progressed? Has the procurement of equipment started? Thank you very much