HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

In PROII, how should I configure it after connecting the reboiler at the bottom of the tower to a simple heat exchanger? ?

2012-05-07View Original

Thread Content

In PROII, how should I configure it after connecting the reboiler at the bottom of the tower to a simple heat exchanger? ? The tower has converged, and a simple heat exchanger has been connected to the tower! The inlet stream of the simple heat exchanger has its composition, temperature, pressure, and flow rate specified. For simple heat exchangers, it is still necessary to specify the pressure drop and the temperature of the outlet stream. However, in principle, the heating load of the reboiler in the tower has already been taken into account, so there is no need to specify the outlet stream temperature. Yet if this parameter is not entered, an error message is displayed; when it is entered, the message reads “1 error(s), 0 warning(s), and 0 message(s) detected: *** error *** Unit 2, ‘t1’ – the duty on heater ‘1’ cannot be varied because it has been specified by a heat exchanger – unit # ‘5’. Experts, how can this issue be resolved?
Reply #22012-05-07
It’s not that the temperature of the outlet stream cannot be set; it’s connected to the tower. What matters is that for this simple heat exchanger, the parameters related to the heat transfer medium and the heat load have already been determined, but the relevant parameters for the other stream still need to be fully specified.
Reply #32012-05-08
But once it’s set, an error occurs. Logically, that shouldn’t happen. It’s confusing, haha
Reply #42012-05-09
The last edit to this post was made by haimesa on 2012-5-9 at 08:40. In the Column Specifications and Variables section of the tower, by removing the reboiler heat load from the variables and keeping only the heat load of the top condenser, it becomes possible to enter the exit temperature of the reboiler heat stream at that simple heat exchanger you have connected.
Reply #52012-05-09
Haha, thanks. I see now – there’s an option for the outlet temperature that allows the software to calculate the reboiler load itself. Haha, thank you!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.