Procedure for reporting pressure vessels

2012-05-09View Original

Thread Content

As the client, with the current factory in the installation phase, how should the inspection procedures for pressure vessels be carried out and what are the specific steps?
Reply #22012-05-09
It should be the construction unit (one that has the appropriate installation qualifications) that goes to the local quality supervision department to complete the necessary reporting procedures. After accepting the application, the quality supervision department will assign appropriate supervisors to the site to oversee the installation process. Once the installation is completed, the supervision department will issue a report confirming that the installation has been done satisfactorily. During this period, as the client, it is the responsibility to assist the installation team by providing all necessary documents for the equipment installation and offering full cooperation. Within one month after the installation is completed and the equipment is put into use, registration of the container must be carried out at the relevant container registration authority.
Reply #32012-05-09
Please visit the link http://bbs.hcbbs.com/forum.php?mod=viewthread&tid=997885&page=1 for a more detailed explanation.
Reply #42012-05-09
In accordance with the principle that the party responsible for installation must provide notification, it is the construction company that should go through the notification procedures before installation: it is necessary to fill out the pressure vessel registration form based on the equipment list, and enter such information into the \"Special Equipment Information Management System\" (which is available in all provinces). Then go to the supervision and inspection department to complete the notification procedures. On-site progress inspection during the installation process. Issue an installation supervision and inspection report. After applying for registration on the \"Special Equipment Information Management System,\" gather documents such as the pressure vessel registration form and installation inspection report, and take them to the local regulatory authorities to complete the registration process

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.