This post was last edited by ztr1118 on 2012-5-9 at 21:05. Our factory has newly installed a flue gas desulfurization absorber tower with a diameter of 9.5 meters and a height of 35 meters. The flue gas inlet is located 5 meters at the bottom of the tower, and the flue is 3 meters high and 2.8 meters wide. Is reinforcement needed at the inlet of the tower? If necessary, how should it be strengthened?
Reply #22012-05-10
Such a large diameter! I’ve never worked with something this big before; whether it’s necessary depends on the calculations. It’s hard to say without calculating
Reply #32012-05-10
Let’s do the calculations according to ASME standards; for an opening of this size, GB150 standards are not applicable. Even for a tower operating at atmospheric pressure, reinforcement is necessary, and the reinforcing plates together with the stirrups also serve a fixing function
Reply #42012-05-10
If there is no pressure, no reinforcement is needed; judging from the owner’s situation, just tightening a few wires to reinforce it will suffice.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.