The question is as stated in the title; it would be great if there could be a more detailed explanation. Thank you.
Before initiating a project, a feasibility study report must be prepared to assess from various perspectives whether the project is viable and to identify the favorable and unfavorable factors, before a decision can be made regarding its initiation; After the project is approved, a safety pre-assessment of the construction project must be carried out. Once this pre-assessment is complete, a qualified safety production service agency will conduct a \"safety facility design\" based on the potential hazards identified in the assessment report. After the design is finished, a separate document detailing the safety facility design will be prepared. Of course, after the construction is completed, an evaluation to assess the actual effectiveness of these safety measures is also necessary.
As a supplementary point, various specialized evaluations are carried out based on the feasibility study (including safety pre-evaluations). The project then refines the feasibility study in accordance with the requirements of these evaluations to develop a preliminary design; the section dedicated to safety facility design is part of this preliminary design, but it must be reviewed separately by the safety supervision department
Prepare a safety pre-assessment report based on the feasibility study, and carry out the safety installations based on that report.
Project construction is divided into several phases: feasibility study, preliminary design, and detailed design. The feasibility study, also known as a feasibility report, serves as a basis for decision-making by the project developer. Once the feasibility study is completed, environmental impact assessments and safety assessments are carried out; these assessments must be conducted by entities qualified to perform such evaluations. Once the feasibility study is completed, the preliminary design phase begins, and the safety section is an important part of this phase. After completion, it shall be submitted to the Safety Supervision Bureau for approval; only upon approval can the construction phase begin.