Discussion on the technical research topic for increasing steam generation capacity in hydrogen production conversion gas steam generators

2020-03-04View Original

Thread Content

The conversion gas steam generator in the hydrocarbon vapor hydrogen production plant is located between the conversion furnace and the medium-temperature shift reactor; the fluid flowing inside the tubes is conversion gas at 780°C and 2.8 MPa, while the fluid flowing outside the tubes is deoxygenated water at 3.9 MPa and 270°C in the steam drum. How can the process and equipment be optimized so as to increase the heat transfer capacity of the heat exchangers, thereby boosting the steam production of the thermal system?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.