HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

True or False Questions – Dry Gas Recovery and Wastewater Stripping Version, 2019.03.16

2019-03-16View Original

Thread Content

Participation: Prize 1 Wealth; Correct answer: 3 wealth rewards ; Note: This post is valid for 48 hours. https://bbs.hcbbs.com/static/image/hrline/2.gif 【Daily Question】True or False: During the process of switching a control valve to a bypass line, the bypass line should be fully opened first, and then the control valve should be closed. ( ) Answer: Incorrect. During the process of switching the control valve to the bypass line, it is necessary to first open a little of the bypass line, and then close the control valve.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.